Navigation : EXPO21XX > METALWORKING 21XX > H43: Storage and Warehousing > sayal CRANE systems
  • Offer Profile
  • SAYAL Crane have been able to take its place among the top prestigious corporate sector of production and installation of Overhead Cranes and Gantry Cranes. SAYAL is to contribute to increased value to our region and the world as a hole by taking our place among the leading crane manufactures in the world.
Product Portfolio
  • Double Girder Hoists

  • Double Girder Hoists

    Standard wire rope hoists production from 2 ton until 80 ton

    • Lifting system with top-notch German technology.
    • Soft lifting and lowering movement with PLC units.
    • Soft start option managed from PLC unit (prevents breakage of motor against continuous start-and-stop commands).
    • Lifting brake with one million click warranty.
    • Soft acceleration with frequency inverter.
    • Load limiting with load-cell unit.
    • IP65 protection class.
    • Long working life, practical installation with specially designed plastic rope guide and minimization of damage caused by broken guide parts to personnel working under crane.
    • Articulated body and end-carriage connection.
    • Double stage (start-stop) limit switch in cross travel movements.
    • Lower-top lift limitation with rotating switch.
    • Pendant controller with emergency stop button.
    • 24V-DC pendant controller voltage.
    • Power supply with 24V-DC output short circuit safety.
    • Phase protection relay, * PTC- Protection against overheating for the lifting motor.
    • Over-current protection with circuit breakers and thermal magnetic protection.
    • Optional load display indicator.
    • Optional anti-collision sensor (in double lift group applications).
      • SY.3.2 AVB

      •  
        • Lifting Capacity (kg) 3200
        • Working Class FEM 2m
        • Lifting Speed- Twin Speed (m/min.) 0,6 / 3,9
        • Travelling Speed (m/min.) 5 / 20
        • Lifting Motor Power (kW) 0,37 / 2,5
        • Travelling Motor Power (kW) 0,55
        • Rope Diameter (mm) 8
        • Reeving 4 / 1
      • SY.5 AVB

      •  
        • Lifting Capacity (kg) 5000
        • Working Class FEM 2m
        • Lifting Speed- Twin Speed (m/min.) 0,8 / 5,2
        • Travelling Speed (m/min.) 5 / 20 / 0,75
        • Lifting Motor Power (kW) 0,8 / 4,9
        • Travelling Motor Power (kW) 5 / 20
        • Rope Diameter (mm) 10
        • Reeving 4 / 1
      • SY.6.3 AVB

      •  
        • Lifting Capacity (kg) 6300
        • Working Class FEM 2m
        • Lifting Speed- Twin Speed (m/min.) 0,8 / 5,2
        • Travelling Speed (m/min.) 5 / 20
        • Lifting Motor Power (kW) 0,8 / 4,9
        • Travelling Motor Power (kW) 0,75
        • Rope Diameter (mm) 10
        • Reeving 4 / 1
      • SY.10 AVB

        • Lifting Capacity (kg) 10000
        • Working Class FEM 2m
        • Lifting Speed- Twin Speed (m/min.) 0,7 / 4
        • Travelling Speed (m/min.) 5 / 20
        • Lifting Motor Power (kW) 1,5 / 9,5
        • Travelling Motor Power (kW) 1,1
        • Rope Diameter (mm) 14
        • Reeving 4 / 1
      • SY.12.5 AVB

        • Lifting Capacity (kg) 12500
        • Working Class FEM 2m
        • Lifting Speed- Twin Speed (m/min.) 0,7 / 4
        • Travelling Speed (m/min.) 5 / 20
        • Lifting Motor Power (kW) 1,5 / 9,5
        • Travelling Motor Power (kW) 1,1
        • Rope Diameter (mm) 14
        • Reeving 4 / 1
      • SY.16 AVB

        • Lifting Capacity (kg) 16000
        • Working Class FEM 2m
        • Lifting Speed- Twin Speed (m/min.) 0,7 / 4
        • Travelling Speed (m/min.) 5 / 20
        • Lifting Motor Power (kW) 2,6 / 16
        • Travelling Motor Power (kW) 1,1
        • Rope Diameter (mm) 16
        • Reeving 4 / 1
      • SY.20 AVB

        • Lifting Capacity (kg) 20000
        • Working Class Fem 1Am / Fem 2m
        • Lifting Speed- Twin Speed (m/min.) 0,7 / 4
        • Travelling Speed (m/min.) 5 / 20
        • Lifting Motor Power (kW) 2,6 / 16
        • Travelling Motor Power (kW) 1,1
        • Rope Diameter (mm) 18
        • Reeving 4 / 1
      • SY.25 AVB

        • Lifting Capacity (kg) 25000
        • Working Class Fem 1Am
        • Lifting Speed- Twin Speed (m/min.) 0,5 / 3,4
        • Travelling Speed (m/min.) 5 / 20
        • Lifting Motor Power (kW) 2,6 / 16
        • Travelling Motor Power (kW) 2 x 1,1
        • Rope Diameter (mm) 20
        • Reeving 4 / 1
      • SY.32 AVB

        • Lifting Capacity (kg) 32000
        • Working Class Fem 1Am
        • Lifting Speed- Twin Speed (m/min.) 0,3 / 2,3
        • Travelling Speed (m/min.) 5 / 20
        • Lifting Motor Power (kW) 2,6 / 16
        • Travelling Motor Power (kW) 2 x 1,1
        • Rope Diameter (mm) 18
        • Reeving 6 / 1
    • Single Girder Hoists

    • Single Girder Hoists

      Standard wire rope hoists production from 2 ton until 16 ton

      • Lifting system with top-notch German technology.
      • Soft lifting and lowering movement with PLC units.
      • Soft start option managed from PLC unit (prevents breakage of motor against continuous start-and-stop commands).
      • Lifting brake with one million click warranty.
      • Soft acceleration with frequency inverter.
      • Load limiting with load-cell unit.
      • IP65 protection class.
      • Long working life, practical installation with specially designed plastic rope guide and minimization of damage caused by broken guide parts to personnel working under crane.
      • Articulated body and end-carriage connection.
      • Double stage (start-stop) limit switch in cross travel movements.
      • Lower-top lift limitation with rotating switch.
      • Pendant controller with emergency stop button.
      • 24V-DC pendant controller voltage.
      • Power supply with 24V-DC output short circuit safety.
      • Phase protection relay, * PTC- Protection against overheating for the lifting motor.
      • Over-current protection with circuit breakers and thermal magnetic protection.
      • Optional load display indicator.
      • Optional anti-collision sensor (in double lift group applications).
        • SY.3.2 MV

          • Lifting Capacity (kg) 3200
          • Working Class FEM 2mm
          • Lifting Speed- Twin Speed (m/min.) 0,6 / 3,9
          • Travelling Speed (m/min.) 5 / 20
          • Lifting Motor Power (kW) 0,37 / 2,5
          • Travelling Motor Power (kW) 0,55
          • Rope Diameter (mm) 8
          • Reeving 4 / 1
        • SY.5 MV

          • Lifting Capacity (kg) 5000
          • Working Class FEM 2m / FEM 2mm
          • Lifting Speed- Twin Speed (m/min.) 0,7 / 4,7
          • Travelling Speed (m/min.) 5 / 20
          • Lifting Motor Power (kW) 0,8 / 4,9
          • Travelling Motor Power (kW) 0,75
          • Rope Diameter (mm) 10mm-4/1
        • SY.6.3 MV

          • Lifting Capacity (kg) 6300
          • Working Class FEM 2mm
          • Lifting Speed- Twin Speed (m/min.) 0,8 / 5,2
          • Travelling Speed (m/min.) 5 / 20
          • Lifting Motor Power (kW) 0,8 / 4,9
          • Travelling Motor Power (kW) 0,75
          • Rope Diameter (mm) 10mm-4/1
        • SY.10 MV

          • Lifting Capacity (kg) 10000
          • Working Class FEM 2m / FEM 2mm
          • Lifting Speed- Twin Speed (m/min.) 0,7 / 4
          • Travelling Speed (m/min.) 5 / 20
          • Lifting Motor Power (kW) 1,5 / 9,5
          • Travelling Motor Power (kW) 1,1
          • Rope Diameter (mm) 14mm /14mm-4/1
      • Crane Systems

          • Double Girder Overhead Travelling Cranes

          • Double girder overhead travelling cranes are composed of lifting trolleys and end-carriages on two box girders which are obtained from sheet metal with welding processes. With standard production from 2 ton to 50 tons, and process cranes from 50 to 250 tons we count with effective solutions for wide spans and high lift capacities. Thanks to the maintenance platform available in one of the beams, maintenance and fault conditions solving are facilitated. Generally, the main energy supply is provided by the bus-bar system, and the lifting group power line is provided by the c-profile or IPN profile system.

          • Single Girder Overhead Travelling Cranes

          • Single girder overhead travelling cranes consist of lifting trolleys and end-carriages on a steel construction made of box beams or prefabricated steel beams (HEA, HEB, IPN, etc.). It is generally preferred for low lifting capacities and short bridge spans. Although it is an effective solution for low headroom between the ceilings and crane runway, it is advantageous in terms of initial investment cost. Generally, the main energy supply is provided by the bus-bar system, and the monorail lifting group power line is provided by the c profile or the moving cable channel. This type is preferred in many areas of the industry like: manufacturing, assembly lines, paint booths and over-the-counter material loading.