Monorail
Single girder crane EHB

HB-systems


Double-rail system


At a glance

  • Better load distribution on the suspensions.
  • Wide suspension spacing.
  • Particularly favourable lifting height with chain hoist suspended between rails.
  • Optional electric hoist travel.
  • Optional mobile control.
  • Great choice of standard mounting options.
  • Great range of additional equipment as option.
Interested in this product?
Then request now for an offer!

DOUBLE-RAIL SYSTEM

Two crane tracks are suspended in parallel for the ABUS double rail system with the hoist suspended between them. The loads are distributed more evenly meaning less loading for the building structure. Wider suspension spacing is possible.

With the hoist, an ABUS electric chain hoist, suspended between the track profiles, the highest hook position is improved compared to the monorail system.