{"id":20370,"date":"2016-01-18T09:38:53","date_gmt":"2016-01-18T08:38:53","guid":{"rendered":"http:\/\/www.expo21xx.com\/news\/?p=20370"},"modified":"2016-01-18T17:56:17","modified_gmt":"2016-01-18T16:56:17","slug":"senvion-26-mm82-turbines","status":"publish","type":"post","link":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/","title":{"rendered":"Senvion to install 26 MM82 turbines for Bois de la Serre wind farm"},"content":{"rendered":"<div id=\"attachment_20371\" class=\"wp-caption aligncenter\" style=\"width: 399px\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-20371\" src=\"http:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Senvion-26-MM82-turbines-399x600.jpg\" alt=\"Photo by Senvion SE\" width=\"399\" height=\"600\" srcset=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Senvion-26-MM82-turbines-399x600.jpg 399w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Senvion-26-MM82-turbines-69x104.jpg 69w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Senvion-26-MM82-turbines-233x350.jpg 233w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Senvion-26-MM82-turbines.jpg 800w\" sizes=\"auto, (max-width: 399px) 100vw, 399px\" \/><p class=\"wp-caption-text\"><i>Photo by Senvion SE<\/i><\/p><\/div>\n<p>Senvion, one of the world\u2019s biggest wind turbine manufacturers, has successfully contracted 74 megawatts (MW) with RES for two wind projects in France. Senvion will equip the Sambre\u0300s wind farm with 26 Senvion MM82 turbines, in addition 11 Senvion MM92 turbines have been installed for the Bois de la Serre wind farm. These will together produce enough electricity to power more than 24,600 three-person households (including heating) in France every year. Senvion will provide full maintenance services to the wind farms for a period of 10 years with an option to be extended to up to 15 years. Upon completion, the wind farms will save 47,300 metric tons of CO2 emissions every year.<\/p>\n<p>The Bois de la Serre wind farm consists of eleven Senvion MM92 turbines, each with a rated power of 2 MW and a hub height of 88.5 meters. The installed turbines have been commissioned by end of December 2015. The Sambre\u0300s wind farm will consist of 26 MM82 turbines, each with a hub height of 85 meters. The construction has already started, and five turbines have already been installed. The commissioning of the entire wind farm is planned for mid-2016. Both projects are located in a mountain and forest area where the wind is particularly strong and turbulent. To preserve the forest and avoid cutting down trees, the Senvion turbines were mounted blade by blade and are delivered with specific hub heights to comply with the site conditions.<\/p>\n<p>Olivier Perot, Managing Director of Senvion Europe South West, says: \u201cWe are proud that RES is continuing its business partnership with Senvion for these complex projects. This highlights the capabilities of Senvion to serve the whole French market with a tailored product and service portfolio.\u201d<\/p>\n<p>Matthieu Gue\u0301rard, Managing Director of RES Southern Europe, adds: \u201cWe are very pleased to be building these two projects in the Black Mountain area in Languedoc using Senvion turbines that meet the specific requirements of these technically challenging sites. These new projects, with an installed capacity of 74 MW, add to the 45 MW of wind farms already built by RES in the Black Mountain area, where renewable energies are an important factor for the local economic development.\u201d<\/p>\n<p>For more information, please visit <a href=\"http:\/\/www.expo21xx.com\/link\/redirector.php4?url=http:\/\/www.senvion.com\" target=\"_blank\">http:\/\/www.senvion.com<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Senvion, one of the world\u2019s biggest wind turbine manufacturers, has successfully contracted 74 megawatts (MW) with RES for two wind projects in France. Senvion will equip the Sambre\u0300s wind farm with 26 [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":20372,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[7],"tags":[400,19,437,344],"class_list":["post-20370","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-renewable-energy","tag-renewable-energy-2","tag-wind-energy","tag-wind-park","tag-wind-turbines"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Senvion to install 26 MM82 turbines for Bois de la Serre wind farm - EXPO21XX.com NEWS<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kamil\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/\"},\"author\":{\"name\":\"Kamil\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#\\\/schema\\\/person\\\/a3bdd56e105c5a6e13cc451f3b6d1959\"},\"headline\":\"Senvion to install 26 MM82 turbines for Bois de la Serre wind farm\",\"datePublished\":\"2016-01-18T08:38:53+00:00\",\"dateModified\":\"2016-01-18T16:56:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/\"},\"wordCount\":386,\"image\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/wp-content\\\/uploads\\\/featured-Senvion-26-MM82-turbines.jpg\",\"keywords\":[\"renewable energy\",\"wind energy\",\"wind park\",\"wind turbines\"],\"articleSection\":[\"\u00bb Renewable Energy\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/\",\"url\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/\",\"name\":\"Senvion to install 26 MM82 turbines for Bois de la Serre wind farm - EXPO21XX.com NEWS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/wp-content\\\/uploads\\\/featured-Senvion-26-MM82-turbines.jpg\",\"datePublished\":\"2016-01-18T08:38:53+00:00\",\"dateModified\":\"2016-01-18T16:56:17+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#\\\/schema\\\/person\\\/a3bdd56e105c5a6e13cc451f3b6d1959\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/wp-content\\\/uploads\\\/featured-Senvion-26-MM82-turbines.jpg\",\"contentUrl\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/wp-content\\\/uploads\\\/featured-Senvion-26-MM82-turbines.jpg\",\"width\":266,\"height\":159},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/senvion-26-mm82-turbines\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Senvion to install 26 MM82 turbines for Bois de la Serre wind farm\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/\",\"name\":\"EXPO21XX.com NEWS\",\"description\":\"Robotics and industrial factory automation, sensors, material handling and renewable energy news magazine\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#\\\/schema\\\/person\\\/a3bdd56e105c5a6e13cc451f3b6d1959\",\"name\":\"Kamil\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/109b53a0c68d37db1287943ecba6e22713e24cfc63b96c161ff00f0c2bfb3f93?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/109b53a0c68d37db1287943ecba6e22713e24cfc63b96c161ff00f0c2bfb3f93?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/109b53a0c68d37db1287943ecba6e22713e24cfc63b96c161ff00f0c2bfb3f93?s=96&d=mm&r=g\",\"caption\":\"Kamil\"},\"url\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/author\\\/kamil\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Senvion to install 26 MM82 turbines for Bois de la Serre wind farm - EXPO21XX.com NEWS","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/","twitter_misc":{"Written by":"Kamil","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/#article","isPartOf":{"@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/"},"author":{"name":"Kamil","@id":"https:\/\/www.expo21xx.com\/news\/#\/schema\/person\/a3bdd56e105c5a6e13cc451f3b6d1959"},"headline":"Senvion to install 26 MM82 turbines for Bois de la Serre wind farm","datePublished":"2016-01-18T08:38:53+00:00","dateModified":"2016-01-18T16:56:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/"},"wordCount":386,"image":{"@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/#primaryimage"},"thumbnailUrl":"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/featured-Senvion-26-MM82-turbines.jpg","keywords":["renewable energy","wind energy","wind park","wind turbines"],"articleSection":["\u00bb Renewable Energy"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/","url":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/","name":"Senvion to install 26 MM82 turbines for Bois de la Serre wind farm - EXPO21XX.com NEWS","isPartOf":{"@id":"https:\/\/www.expo21xx.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/#primaryimage"},"image":{"@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/#primaryimage"},"thumbnailUrl":"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/featured-Senvion-26-MM82-turbines.jpg","datePublished":"2016-01-18T08:38:53+00:00","dateModified":"2016-01-18T16:56:17+00:00","author":{"@id":"https:\/\/www.expo21xx.com\/news\/#\/schema\/person\/a3bdd56e105c5a6e13cc451f3b6d1959"},"breadcrumb":{"@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/#primaryimage","url":"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/featured-Senvion-26-MM82-turbines.jpg","contentUrl":"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/featured-Senvion-26-MM82-turbines.jpg","width":266,"height":159},{"@type":"BreadcrumbList","@id":"https:\/\/www.expo21xx.com\/news\/senvion-26-mm82-turbines\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.expo21xx.com\/news\/"},{"@type":"ListItem","position":2,"name":"Senvion to install 26 MM82 turbines for Bois de la Serre wind farm"}]},{"@type":"WebSite","@id":"https:\/\/www.expo21xx.com\/news\/#website","url":"https:\/\/www.expo21xx.com\/news\/","name":"EXPO21XX.com NEWS","description":"Robotics and industrial factory automation, sensors, material handling and renewable energy news magazine","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.expo21xx.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.expo21xx.com\/news\/#\/schema\/person\/a3bdd56e105c5a6e13cc451f3b6d1959","name":"Kamil","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/109b53a0c68d37db1287943ecba6e22713e24cfc63b96c161ff00f0c2bfb3f93?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/109b53a0c68d37db1287943ecba6e22713e24cfc63b96c161ff00f0c2bfb3f93?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/109b53a0c68d37db1287943ecba6e22713e24cfc63b96c161ff00f0c2bfb3f93?s=96&d=mm&r=g","caption":"Kamil"},"url":"https:\/\/www.expo21xx.com\/news\/author\/kamil\/"}]}},"_links":{"self":[{"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/posts\/20370","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/comments?post=20370"}],"version-history":[{"count":3,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/posts\/20370\/revisions"}],"predecessor-version":[{"id":20374,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/posts\/20370\/revisions\/20374"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/media\/20372"}],"wp:attachment":[{"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/media?parent=20370"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/categories?post=20370"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/tags?post=20370"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}