{"id":53407,"date":"2024-07-16T08:00:22","date_gmt":"2024-07-16T06:00:22","guid":{"rendered":"https:\/\/www.expo21xx.com\/news\/?p=53407"},"modified":"2024-07-14T10:45:07","modified_gmt":"2024-07-14T08:45:07","slug":"stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain","status":"publish","type":"post","link":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/","title":{"rendered":"STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain"},"content":{"rendered":"\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"381\" src=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-700x381.png\" alt=\"\" class=\"wp-image-53409\" srcset=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-700x381.png 700w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-149x81.png 149w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-350x191.png 350w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-768x418.png 768w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption>Photo by STADLER Anlagenbau GmbH<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><em>STADLER<\/em> Anlagenbau GmbH, the globally active German company specialising in the planning, production and assembly of turnkey recycling and sorting plants, has designed and built a state-of-the-art light packaging sorting plant for public enterprise Vaersa in Alzira, Spain.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The opening ceremony of the new Vaersa light packaging plant, designed and built by STADLER in Alzira, took place on July 3rd. This facility, a benchmark in the Spanish waste management sector, was inaugurated in the presence of key local government officials: Salom\u00e9 Pradas, Councillor of Environment, Water, Infrastructure and Territory; Francisco Javier Sendra, Regional Secretary of Environment and Territory; and Jorge Blanco, Director General of Quality and Environmental Education. Top management from Vaersa, including General Manager Jos\u00e9 Alberto Comos and Deputy Manager Ra\u00fal Esteban, attended the event, along with Ismael Avil\u00e9s Ortega, Operations Manager Spain at STADLER, Vicent Estruch, President of the V4 Ribera-Valdigna Consortium, and Alfons Dominguez, Mayor of Alzira.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Noelia Almi\u00f1ana Lled\u00f3, Head of Vaersa&#8217;s Waste Department, opened the proceedings by recalling the beginnings of the Alzira site with a manual sorting plant back in 2000. She highlighted the progress achieved through STADLER\u2019s automation of the process and emphasized that the plant will ensure the correct recovery of light packaging from now on. Jos\u00e9 David Castillo C\u00e1ceres, Alzira Light Packaging Sorting Plant Manager, took over with a presentation of the new plant. A video of the construction project and the sorting line in operation closed the event.<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"381\" src=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.24-700x381.png\" alt=\"\" class=\"wp-image-53410\" srcset=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.24-700x381.png 700w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.24-149x81.png 149w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.24-350x191.png 350w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.24-768x418.png 768w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption>Photo by STADLER Anlagenbau GmbH<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Vaersa\u2019s requirements: more capacity and quality through automation<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Vaersa is a public enterprise reporting to the Department of Agriculture, Rural Development, Ecological Transition, and Climate Emergency of the Generalitat Valenciana (government of the Valencian Autonomous Community). It provides services related to environmental management, including waste management aimed at achieving a circular economy. It began managing the light packaging sorting infrastructure for the Valencian Community in 2000, coinciding with the implementation of separate waste collection. The facilities include the light packaging plant in Alzira, the oldest of the four it operates.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In 2023, Vaersa decided to invest in upgrading and expanding the capacity of the Alzira plant to address the increasing volumes of light packaging waste and to improve the quality of the output for recycling. As a public enterprise, it issued a call for tenders to award the project under the Public Sector Contracts Law. The tender criteria included designing the sorting line to prioritise maximising recovery, facilitate operation and ease of movement within the facility, and enhance operating efficiency through the placement of every piece of equipment and their implementation. Ergonomics and safety of plant personnel in all aspects of operation, from sorting tasks and quality control to cleaning, operation and maintenance were key for&nbsp;the project. The tender criteria also required to include an analysis of preventive and corrective maintenance, and measures to ensure the processing line\u2019s modularity and flexibility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">STADLER presented a highly detailed preliminary project, which was the highest rated by the contracting committee, and was awarded the contract. Noelia Almi\u00f1ana Lled\u00f3 explains: \u201cThe Alzira Packaging Sorting Plant was the oldest of the VAERSA Plants and therefore the least automated. Our foremost and greatest challenge was to implement an automated processing line that would double the existing plant\u2019s capacity in the same space. STADLER designed a compact process line that fits the available space, incorporating the most modern sorting technology without compromising its operation, performance and efficiency.\u201d<\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"463\" src=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.16-700x463.png\" alt=\"\" class=\"wp-image-53411\" srcset=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.16-700x463.png 700w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.16-149x99.png 149w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.16-350x232.png 350w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.16-768x508.png 768w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption>Photo by STADLER Anlagenbau GmbH<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STADLER\u2019s solution: more than double the capacity, higher output quality, future-proof<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">The new plant increases the facility\u2019s capacity from 3 t\/h to 8 t\/h, making it one of the largest sorting plants in Spain by capacity. Installation in the same building as its predecessor introduced significant space constraints, which STADLER\u2019s design successfully addressed: \u201cOne of the main challenges was that we were replacing an existing plant,\u201d explains Ismael Avil\u00e9s Ortega<strong>,<\/strong> Operations Manager Spain at STADLER. \u201cThis required a meticulously studied design to fit within the existing building, making the preparatory work of our engineers crucial.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">STADLER\u2019s design for the new plant automates the sorting process with two sorting cabins, two STADLER STT2000 ballistic separators that separate the flexible and 3D materials, magnetic and eddy current separators that sort metals into ferrous and non-ferrous, and optical sorters that recover recycling materials. The output is sorted into PET, HDPE, film, Tetra-Pak, plastic mix, and ferrous and non-ferrous metals. At the end of the process, the recovered materials are baled and sent for recycling. The new plant design also enhances the efficiency of the sorting process and improves the quality of the output fractions, supporting Vaersa\u2019s commitment to advancing towards a circular economy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">STADLER\u2019s design stands out for the flexibility and modularity of the processing line. This means that Vaersa can rely on uninterrupted operation: \u201cBypass systems have been designed to ensure continuous treatment in the event of critical equipment shutdowns,\u201d comments Jose David Castillo C\u00e1ceres. \u201cWe also appreciate the standardization of mechanical and electrical equipment and components which helps optimize the management of spare parts.\u201d<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">STADLER\u2019s solution future-proofs the Alzira sorting plant. Its flexibility allows for further expansion in the plant\u2019s capacity to absorb the expected increase in incoming waste resulting from growing public awareness and commitment to separation at source. In addition, it addresses possible changes in the incoming waste due to \u201cits ability to adapt to potential changes in the characteristics and composition of the input materials. To this end, STADLER has allocated space reserves that will allow for the future installation of new equipment for possible process adaptations,\u201d explains Jose David Castillo C\u00e1ceres.<strong>&nbsp;<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"700\" height=\"463\" src=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.12-700x463.png\" alt=\"\" class=\"wp-image-53412\" srcset=\"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.12-700x463.png 700w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.12-149x99.png 149w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.12-350x232.png 350w, https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.12-768x508.png 768w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><figcaption>Photo by STADLER Anlagenbau GmbH<\/figcaption><\/figure>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>A successful collaboration<\/strong><\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Effective communication and close collaboration of all parties involved in the development and implementation were critical to a successful outcome due to the complexity of the project. \u201cIt involved dismantling the complete existing plant, which was done in record time. Other companies performed civil works, so good communication and coordination were essential,\u201d says Ismael Avil\u00e9s Ortega.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u201cIt\u2019s worth highlighting the good planning of the works and compliance with all the execution deadlines. We are impressed by the professionalism of STADLER\u2019s highly qualified staff, the technical capability of its entire team, from the Projects Department, which designs the best possible solution for the requirements, to the assembly staff, always available to resolve any unforeseen event. Indeed, during the project\u2019s development, improvements to the original design were implemented and STADLER consistently addressed them promptly and effectively, without impacting the scheduled completion timeline,\u201d concludes Diana Torres, Project Manager at Vaersa.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Watch the transformation of the old plant into today\u2019s state-of-the-art facility:<\/p>\n\n\n\n<figure class=\"wp-block-embed-youtube wp-block-embed is-type-video is-provider-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<iframe loading=\"lazy\" title=\"STADLER Sorting Plant for light packaging for Vaersa, in Alzira, Spain\" width=\"500\" height=\"281\" src=\"https:\/\/www.youtube.com\/embed\/S3v0gUgs7g0?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe>\n<\/div><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">For more information, please visit: <a href=\"https:\/\/w-stadler.de\/en\/company\/news\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"https:\/\/w-stadler.de\/en\/company\/news (opens in a new tab)\">https:\/\/w-stadler.de\/en\/company\/news<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>STADLER Anlagenbau GmbH, the globally active German company specialising in the planning, production and assembly of turnkey recycling and sorting plants, has designed and built a state-of-the-art light packaging sorting plant for [&hellip;]<\/p>\n","protected":false},"author":12,"featured_media":53415,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1156],"tags":[867,1456,1662,1200],"class_list":["post-53407","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-environmental-technology","tag-recycling","tag-recycling-belt","tag-recycling-industry","tag-recycling-plant"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain - EXPO21XX.com NEWS<\/title>\n<meta name=\"description\" content=\"STADLER Anlagenbau GmbH has designed and built a state-of-the-art light packaging sorting plant for public enterprise Vaersa in Alzira, Spain.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Marcel Huegel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/\"},\"author\":{\"name\":\"Marcel Huegel\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#\\\/schema\\\/person\\\/bd95c8756a923fd2192f30b343b9c719\"},\"headline\":\"STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain\",\"datePublished\":\"2024-07-16T06:00:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/\"},\"wordCount\":1150,\"image\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/wp-content\\\/uploads\\\/Bildschirmfoto-2024-07-14-um-10.38.37-1.png\",\"keywords\":[\"recycling\",\"recycling belt\",\"recycling industry\",\"recycling plant\"],\"articleSection\":[\"\u00bb Environmental Tech\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/\",\"url\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/\",\"name\":\"STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain - EXPO21XX.com NEWS\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/wp-content\\\/uploads\\\/Bildschirmfoto-2024-07-14-um-10.38.37-1.png\",\"datePublished\":\"2024-07-16T06:00:22+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#\\\/schema\\\/person\\\/bd95c8756a923fd2192f30b343b9c719\"},\"description\":\"STADLER Anlagenbau GmbH has designed and built a state-of-the-art light packaging sorting plant for public enterprise Vaersa in Alzira, Spain.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/wp-content\\\/uploads\\\/Bildschirmfoto-2024-07-14-um-10.38.37-1.png\",\"contentUrl\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/wp-content\\\/uploads\\\/Bildschirmfoto-2024-07-14-um-10.38.37-1.png\",\"width\":266,\"height\":159,\"caption\":\"Photo by STADLER Anlagenbau GmbH\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#website\",\"url\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/\",\"name\":\"EXPO21XX.com NEWS\",\"description\":\"Robotics and industrial factory automation, sensors, material handling and renewable energy news magazine\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/#\\\/schema\\\/person\\\/bd95c8756a923fd2192f30b343b9c719\",\"name\":\"Marcel Huegel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/445be14cadaa251e23e106b68eb7c58dd0b9407f22384b86565fc2121a1a512e?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/445be14cadaa251e23e106b68eb7c58dd0b9407f22384b86565fc2121a1a512e?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/445be14cadaa251e23e106b68eb7c58dd0b9407f22384b86565fc2121a1a512e?s=96&d=mm&r=g\",\"caption\":\"Marcel Huegel\"},\"url\":\"https:\\\/\\\/www.expo21xx.com\\\/news\\\/author\\\/marcel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain - EXPO21XX.com NEWS","description":"STADLER Anlagenbau GmbH has designed and built a state-of-the-art light packaging sorting plant for public enterprise Vaersa in Alzira, Spain.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/","twitter_misc":{"Written by":"Marcel Huegel","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/#article","isPartOf":{"@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/"},"author":{"name":"Marcel Huegel","@id":"https:\/\/www.expo21xx.com\/news\/#\/schema\/person\/bd95c8756a923fd2192f30b343b9c719"},"headline":"STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain","datePublished":"2024-07-16T06:00:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/"},"wordCount":1150,"image":{"@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/#primaryimage"},"thumbnailUrl":"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-1.png","keywords":["recycling","recycling belt","recycling industry","recycling plant"],"articleSection":["\u00bb Environmental Tech"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/","url":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/","name":"STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain - EXPO21XX.com NEWS","isPartOf":{"@id":"https:\/\/www.expo21xx.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/#primaryimage"},"image":{"@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/#primaryimage"},"thumbnailUrl":"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-1.png","datePublished":"2024-07-16T06:00:22+00:00","author":{"@id":"https:\/\/www.expo21xx.com\/news\/#\/schema\/person\/bd95c8756a923fd2192f30b343b9c719"},"description":"STADLER Anlagenbau GmbH has designed and built a state-of-the-art light packaging sorting plant for public enterprise Vaersa in Alzira, Spain.","breadcrumb":{"@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/#primaryimage","url":"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-1.png","contentUrl":"https:\/\/www.expo21xx.com\/news\/wp-content\/uploads\/Bildschirmfoto-2024-07-14-um-10.38.37-1.png","width":266,"height":159,"caption":"Photo by STADLER Anlagenbau GmbH"},{"@type":"BreadcrumbList","@id":"https:\/\/www.expo21xx.com\/news\/stadler-enhances-operations-for-vaersa-with-new-light-packaging-plant-inaugurated-in-spain\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.expo21xx.com\/news\/"},{"@type":"ListItem","position":2,"name":"STADLER enhances operations for VAERSA with new light packaging plant inaugurated in Spain"}]},{"@type":"WebSite","@id":"https:\/\/www.expo21xx.com\/news\/#website","url":"https:\/\/www.expo21xx.com\/news\/","name":"EXPO21XX.com NEWS","description":"Robotics and industrial factory automation, sensors, material handling and renewable energy news magazine","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.expo21xx.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.expo21xx.com\/news\/#\/schema\/person\/bd95c8756a923fd2192f30b343b9c719","name":"Marcel Huegel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/445be14cadaa251e23e106b68eb7c58dd0b9407f22384b86565fc2121a1a512e?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/445be14cadaa251e23e106b68eb7c58dd0b9407f22384b86565fc2121a1a512e?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/445be14cadaa251e23e106b68eb7c58dd0b9407f22384b86565fc2121a1a512e?s=96&d=mm&r=g","caption":"Marcel Huegel"},"url":"https:\/\/www.expo21xx.com\/news\/author\/marcel\/"}]}},"_links":{"self":[{"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/posts\/53407","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/comments?post=53407"}],"version-history":[{"count":3,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/posts\/53407\/revisions"}],"predecessor-version":[{"id":53417,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/posts\/53407\/revisions\/53417"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/media\/53415"}],"wp:attachment":[{"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/media?parent=53407"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/categories?post=53407"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.expo21xx.com\/news\/wp-json\/wp\/v2\/tags?post=53407"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}