• RENEWABLE ENERGY 21XX
Navigation : EXPO21XX News » Renewable Energy » Solar Farm constructed by Juwi Solar in Arizona completed

Solar Farm constructed by Juwi Solar in Arizona completed

juwi solar arizona

Photo by Juwi Holding AG

PSEG Solar Source today announced completion of its 19.3 megawatt (MW) DC (15 MW AC) PSEG Badger 1 Solar Farm located on approximately 172 acres west of Phoenix, Arizona. The solar farm was developed and constructed by juwi solar Inc. (JSI). Arizona Public Service Company (APS), the state’s largest and longest serving electric utility will purchase the electricity produced by the facility through a 30-year agreement. Badger 1 Solar will generate enough energy to meet the electricity needs of approximately 3,560 homes.

The solar farm utilizes crystalline panels manufactured by Canadian Solar and a single-axis tracking system manufactured by Array Technologies that allows the panels to track the sun across the sky and increases the amount of electricity generated by each panel. In addition, the project includes inverters manufactured and tested by Phoenix-based Power One. Inverters convert electricity from direct current or DC (which is produced by the solar panels), to alternating current or AC (as it is used in homes and businesses).

“PSEG Solar Source is pleased to add a second Arizona project to our growing solar fleet,” said Diana Drysdale, president, PSEG Solar Source. “PSEG Solar Source is actively seeking additional utility-sized solar projects in the US, where companies either need to meet renewable energy requirements or want to offer their customers clean, emissions-free solar energy.”

“JSI is proud to have successfully completed this project on behalf of PSEG and is looking forward to operating it during the years to come,” said Michael Martin, CEO of JSI. “This project is yet another example of utility-scale solar becoming increasingly cost-competitive with other sources of energy and providing a clean, efficient and low-cost option for Arizona’s ratepayers.” Under a separate agreement, JSI will also perform operation and maintenance services for the project.

For more information, please visit http://www.juwi.de.